List of government of Kenya/Donor Funded Projects (2010 -2015) - Infrastrucuture & Transport

Published July 23, 2019, 3:11 p.m. by Moderator


Estimated Finance Allocations for Government Projects (2014-2015)


This list of projects were undertaken between 2010 -2015 by the Ministry of Transport and Infrastructure. There is a high number of projects with undeclared amounts which makes it very difficult to ascertain if the projects were value for money.


Source: https://www.opendata.go.ke/datasets/2013-2014-summary-of-government-project-finance-allocations-to-implementing-agencies 


 


 


Infrastructure & Trade


Project Title: Emali-Oloitokitok Road Project


Project ID: 2010/051549


Implementing Agency: State Department of Infrastructure


Total Funding by Arab Bank for Economic Development in Africa (BADEA):          2,385,056,070 KES


Total Funding by Organization of Petroleum Exporting Countries (OPEC):            600,000,000 KES


Duration: 102 months


Project Description:


"The Works to be executed under the Contract comprise the construction of approximately 101 km of single carriageway, two lane, bitumen surfaced road between Emali and Oloitokitok (including the Oloitokitok loop) and rehabilitation of the 12 km section between oloitokitok and the border with Tanzania. The major items of Works to be executed under the Contract include the following:


1) Provision of offices, laboratory and housing accommodation for the Resident Engineer and his staff.


2) Site clearance, setting out and taking cross sections.


3) Removal and replacement of top soil and expansive clays.


4) Construction of earthworks.


5) Operation in quarries and borrow areas.


6) Diversion of services required.


7) Maintenance of existing road during the construction period.


8) Management and control of traffic of traffic passing through or around the works.


9) Gravelling of detours, deviations, junctions and accesses, when so instructed.


10)  Construction of approximately 30 lines of pipe culverts and soil erosion protection works.


11) Construction of some 31 No. box culverts and 4 No. bridges of 20 to 60 m spans.


12) Construction of app. 101km of pavement layers generally comprising:


               a) 175mm thick cement improved gravel sub-base


               b) 150mm thick graded crushed stone base layer


               c) Wearing course comprising 50mm asphalt concrete and 10/14 mm pre-coated chippings, and


               d) Single seal surface treatment comprising 10/14 mm chippings and a slurry seal on the shoulders.


13) Rehabilitation of the 12 km section between Oloitokitok and the border with Tanzania.


14) Provision and erection of road furniture including road signs, road markings, edge marker posts, guardrails and other miscellaneous works.


15) Maintenance of the works during the construction period.


16) Rectification of defects affecting the completed road for a period of 24 months.


The construction of Emali- Oloitokitok road will not only facilitate transport and communication in both Kajiado and Oloitokitok districts but will also enhance the drainage system in these areas. The accompanying multiplier effect will increase the income levels of the locals and this will lead to better standards of living.


Project Title: Reconstruction of Multinational Arusha - Namanga Athi River Road Lot K: Athi River - Namanga Section


Project ID: 2010/051736


Implementing Agency: State Department of Infrastructure        


Total Funding by African Development Bank/ Fund: **UNDECLARED AMOUNT**


Duration: 84 months     


Project Description:


The works consists of the reconstruction of the existing bitumen surfaced road to an international trunk road standard with a 7 m wide shoulders on each side for a total length of 136 km. The project includes 5.5 km of service roads within the towns of Athi River, Kitengela, Isinya, Ilbissis and Namanga. The works also include:


1. Construction of junctions, accesses, bus lay byes.


2. Provision and erection of road furniture including road markings.


3. Six new bridges, eight new box culverts, extending nine existing box culverts and the construction of pipe culverts, drainage and all other works or things herein required to be done or which may be ordered by the Engineer under the provision of the Contract.


The reconstruction of this road is expected to increase the income levels of locals and improve the drainage system in the areas concerned.


               


Project Title: Construction of Nairobi Eastern and Northern Bypasses Road Project


Project ID: 2010/052062


Implementing Agency: State Department of Infrastructure        


Total Funding by Government of China: 20,000,000 KES


Duration: 75 months                                                             


Project Description:


Site clearance and top soil removal, Earthworks, Construction of pipe culverts and drainage works, Construction of shoulders, Road markings, Installation of road furniture to open the outskirts of Nairobi and to reduce the ceaseless traffic jams in Nairobi.


Project Title: Nairobi-Thika (A2) Highway Improvement Project Lot 3: Kenyatta University -Thika


Project ID: 2010/052074


Implementing Agency: Ministry of Labour Social Security and Services  


Total Funding by Government of China: 20,000,000 KES


Duration: 77 months                                                             


Project Description:


The project entails improvement of Thika Road to a four lane carriageway to decongest Thika road thereby enhancing trade and mobility of goods, people and services.


Project Title: Mombasa -Nairobi-Addis Ababa Road Corridor Project Phase I I (Marsabit - Turbi Road)


Project ID: 2010/052117


Implementing Agency: State Department of Infrastructure                        


Total Funding by African Development Bank/ Fund: 20,000,000 KES


Duration: 65 months                                                             


Project Description:


1. Road Construction Civil Works-this involves construction to bitumen standard of the road section Marsabit - Turbi (123 km) with 7-m carriageway and 2-m shoulders.


2. Border post and Roadside Socio-Economic Infrastructure -involves the construction and equipment of two Road Stations in Marsabit and Turbi, the construction of One-stop-Border-Post facilities in Moyale, the construction and equipping of security outposts, the construction and equipment of a weighbridge station, and the drilling of community water boreholes and water harvesting schemes.


3. Consulting Services


4. Compensation and resettlement of displaced People.


To promote trade and regional integration


To improve transport and communication between Kenya and Ethiopia for the benefit of both countries and the region.


Project Title: Nuno Modogashe Road Upgrading Project


Project ID: 2011/053139


Implementing Agency:  State Department of Infrastructure                       


Total Funding by Abhu Dhabi Fund: 200,000,000 KES


Total Funding by Arab Bank for Economic Development in Africa (BADEA): 600,000,000 KES


Total Funding by Kuwait Fund for Arab Development: 20,000,000 KES


Total Funding by Organization of Petroleum Exporting Countries (OPEC): 4,400,000,000 KES


Total Funding by Saudi Fund for Development: 20,000,000 KES


Duration: 81 months


Project Description:


The project provides for the upgrading of the Nuno-Modogashe road to bitumen standard, with a length of about 147Kms and width of 6meters, with a shoulder of 1.5meters on each side.           200000000


The project aims to enhance the social and economic development of the North-Eastern Region of the country, reduce the vehicle operating cost and facilitate the transport of goods and passengers to and from the neighbouring countries.


Project Title: Timboroa - Eldoret Road Project


Project ID: 2011/053165


Implementing Agency:  State Department for Infrastructure                     


Total Funding by African Development Bank/ Fund: 200,000,000 KES


Duration: 54 months


Project Description:


Rehabilitation of 73 kms of the road to bituminous standard. Upgrade and rehabilitate the road to bituminous to facilitate trade and minimize motor vehicle repairs on this particular section of the road.


Project Title: East African Trade and Transport Facilitation Project (EATTFP)


Project ID: 2012/053177


Implementing Agency:  State Department of Transport                


Total Funding by International Development Association (IDA): 100,000,000 KES


Duration: 143 months


Project Description:


Strengthen the capacity of EAC Secretariat and customs department in the Regional Countries and improve information connectivity within the EACCU.


Implement the updated RAP and the updated Environmental Impact Assessment and invest in the port of Mombasa. Construction of the weigh bridges.


Improving the trade environment among the Regional Countries, through the effective implementation of the EACCU Protocol. Enhancing the efficiency of transport and logistic services along the key transport corridors by reducing non-tariff barriers. Enhance efficiency of customs agencies clearances processes for EAC Partner States participating in the East Africa Customs Union to facilitate trade.              


Project Title: Northern Corridor Rehabilitation Programme - Phase III (Eldoret-Webuye-Malaba)


Project ID: 2012/053324


Implementing Agency:  State Department of Infrastructure       


Total Funding by European Development Fund: 700,000,000 KES


Duration: 97 months


Project Description:


Rehabilitation of Eldoret - Webuye (59Km) and Webuye - Malaba Road (61Km) Projects. Widening the shoulders from the current 1.5m to 2.0m. Reconstruction of seriously deteriorated sections. In other sections, DBM and AC overlays to enhance the pavement strength. Construction of 2 New Bridges in Webuye - Malaba section (at Malakisi River Crossing and Malaba River Crossing).


1. To rehabilitate the road to maintainable conditions with a technical life extended by 15 years.


2. To contribute/spur the economic growth and improvement of living standards in Kenya and in the neighbouring landlocked countries through a sustainable and safe national road network of which the Northern Corridor is the backbone.


Project Title: Sugar Reforms Support Project (Annual Action Programme 2009 under the Accompanying Measures for Sugar Protocol Countries)


Project ID: 2012/053329


Implementing Agency:  State Department of Infrastructure


Total Funding by European Development Fund: 600,000,000 KES


Duration: 36 months


Project Description:


Upgrading of the 122 km Merille River to Marsabit section of the 1495 km Nairobi - Addis Ababa highway (A2) from the existing gravel surface to paved international standard.        


The overall objective is to attain a sustainable, safe roads network that facilitate economic growth and improvement in living standards.


Project Title: Nairobi Missing Link Roads and Non-Motorised Transport Facilities


Project ID: 2012/053331


Implementing Agency:  State Department of Infrastructure


Total Funding by European Development Fund: 870,954,055 KES


Total Funding by Government of Kenya: 200,000,000 KES


Duration: 84 months


Project Description:


This project contributes to implementation of the Japan International Cooperation Agency's (JICA) financed "Study for the Master Plan for Urban Transport in the Nairobi Metropolitan Area (2006-2025)", adopted by the Government of Kenya.            


Overall objective: Support to transport infrastructure sector is to attain a sustainable, safe roads network that facilitates economic growth, employment and the improvement in socio-economic living standards.


Specific objective: To contribute to the implementation of the master plan for urban transport in the Nairobi metropolitan area (2006-2025) and thereby improve traffic operations and traffic management within Nairobi city and its outskirts.


Project Title: Improving Access in Kenya's National Parks (Bridge over the Galana River)


Project ID: 2012/053332


Implementing Agency:  State Department of Infrastructure


Total Funding by European Development Fund: **UNDECLARED AMOUNT**


Duration: 42 months


Project Description:


Works Contract for the construction of a 220 meter long steel panel bridge across Galana River to open up the northern half of Tsavo East National Park, Supervision of works, project evaluation and audit     


To support the transport the implementation of KWS Strategic Plan specifically the underutilized parks initiative and thereby expand the range of options for wildlife tourism and alleviate pressure on over-exploited ecosystems in major national parks and game reserves in the country  0


Project Title: Mombasa -Nairobi-Addis Ababa Road Corridor Project Phase Three (Turbi-Moyale Road)


Project ID: 2012/053332


Implementing Agency:  State Department of Infrastructure


Total Funding by European Development Fund: 5,501,931,596 KES


Duration: 65 months


Project Description:


Involves upgrading of Turbi-Moyale (122 km) to bituminous standard (Asphalt Concrete) road including construction of bridges, execution of drainage structures, road side amenities and environmental and social mitigation measures. It also includes a link road of 8 km to town of Sololo. Upgrade 122km of Turbi-Moyale road to complete Mombasa-Nairobi-Adidis Ababa Corridor.


Project Title: Kenya Transport Sector Support Project (KTSSP)   


Project ID: 2012/053345


Implementing Agency:  State Department of Infrastructure


Total Funding by International Development Association (IDA): 1,571,527,182 KES


Duration: 64 months


Project Description:


The objective of the project are to


(a) Increase the efficiency of road transport along the northern corridor and the Tanzania -Kenya- Sudan Road Corridor;


(b) Enhance aviation safety and security to meet international standards;


(c) Improve the institutional arrangements and capacity in the transport sector.               


Project Title: Northern Corridor Transport Improvement Project (NCTIP)                             


Project ID: 2012/053362


Implementing Agency:  State Department for Infrastructure     


Total Funding by International Development Association (IDA): 3,100,593,132 KES


Duration: 135 months


Project Description:


Rehabilitation of Northern Corridor and Emergency Restoration of damaged public assets. To enhance efficiency and effectiveness of Kenya's transport sector.          


Project Title: Roads 2000 Project Phase II - EC Stabex                     


Project ID: 2012/053430


Implementing Agency:  State Department of Infrastructure       


Total Funding by European Development Fund: 1,014,324,461 KES


Duration: 77 months


Project Description:


Roadworks component comprising of:


1) Routine maintenance, Spot improvement, partial rehabilitation, rehabilitation of short sections not exceeding 5km, environmental, social and safety issues.


 Capacity  building component of training ; roads department staff in the head office, provincial staff, district supervision staff and small - scale contractor for  roadworks and procurement of equipment.


2) TA component comprising a service contract with a consulting firm to carry out the management of the project.


4) Technical and Financial Audits.


The overall is to reduce transport costs and time for road users to access economic and social services thereby increasing accessibility, income and employment in rural areas.


Project Title: The Construction of Nairobi Western Ring Roads (Detailed Design)


Project ID: 2012/053876


Implementing Agency:  State Department of Infrastructure


Total Funding by Government of Japan: 400,000,000 KES


Duration: 52 months


Project Description:


Decongestion of roads


Project Title: Construction of Nairobi Southern Bypass


Project ID: 2012/053880


Implementing Agency:  State Department of Infrastructure


Total Funding by Government of China: **UNDECLARED AMOUNT**


Duration: 53 months


Project Description:


Road decongestion        


Project Title: Mombasa Port Area Road Development Project


Project ID: 2012/053881


Implementing Agency:  State Department of Infrastructure


Total Funding by Government of Japan: 80,000,000 KES


Duration: 47 months


Project Description:


Construction of Dongo-Kundu By-Pass to improve traffic flow


Project Title: Mombasa Port Development (Phase I)


Project ID: 2012/053891


Implementing Agency:  State Department of Transport


Total Funding by Government of China: 500,000,000 KES


Duration: 59 months


Project Description:


Expansion of the port through development of a new container terminal             to enhance the container handling capacity at the port and to provide handling equipment.              


 


Project Title: Roads 2000 Phase II


Project ID: 2012/053894


Implementing Agency:  State Department of Infrastructure


Total Funding by Government of France: 708,972,818 KES


Duration: 47 months


Project Description:


The Roads 2000 Phase Two Project entails the following components;


Component 1- Physical works


Rehabilitation and maintenance works for rural roads in Murang’a, Nyandarua, Kiambu, Nyeri, Kirinyaga and Laikipia regions. Upgrading of 1083 km of roads in Kiambu, Nyeri, Kirinyaga and Laikipia regions; low-cost sealing road rehabilitation of 106km of well-trafficked roads and routine maintenance of 5,057 km of fair and good roads in the six Regions


Component 2 - Management Support


Strengthening of KeRRA and establishing an efficient system of road maintenance in the six Regions. The support will be provided by the Management Support Team.


Component 3 – This component will involve training and capacity building of private contractors.


The objectives of this project are to:


•Improve the unpaved rural road network in Murang’a, Nyandarua, Kiambu, Nyeri, Kirinyaga and Laikipia Regions


•Strengthen the system for management and maintenance of roads, using labour-based methods, local resources as well as the private sector.


Project Title: Marketing Infrastructure Kenya Phase 1 (2007 65 123) Roads          


Project ID: 2012/053968


Implementing Agency:  State Department of Infrastructure       


Total Funding by Government of Germany (KFW GERMANY): 600,000,000 KES


Duration: 29 months


Project Description:


This project entails the rehabilitation and improvement of rural roads that lead to produce markets in the Districts of Mt. Elgon, Bungoma, Teso, Lugari, Vihiga, Kakamega, Butere and Busia.


The objectives of this project are to:


-Improve the unpaved rural road network in Mt. Elgon, Bungoma, Teso, Lugari, Vihiga, Kakamega, Butere and Busia Districts


-Strengthen the system for management and maintenance of roads, using labour-based methods, local resources as well as the private sector.


-Increase farm incomes through ease accessibility of farm produce markets.


Project Title: East Africa Transit Improvement Programme (EATIP)/ East Africa Trade Facilitation Programme


Project ID: 2012/054037


Implementing Agency:  State Department of Infrastructure       


Total Funding by United Kingdom DFID (UK): 760,791,218 KES


Duration: 18 months


Project Description:


Infrastructure development at the Taveta and Busia border posts. Reduction of clearance time for goods and services moving across Kenya Uganda and Tanzania.      


Project Title: National Urban Transport Improvement Project (NUTRIP)


Project ID: 2012/054006


Implementing Agency:  State Department of Infrastructure/Transport 


Total Funding by International Development Association (IDA): 340,000,000 KES


Duration: 60 months


Project Description:


**UNAVAILABLE**


Project Title: Support to Road Sector: Capacity Building Component


Project ID: 2013/054193


Implementing Agency:  State Department of Infrastructure       


Total Funding by European Development Fund: **UNDECLARED AMOUNT**


Duration: 75 months


Project Description:


Design studies for urban and Tourism roads to be implemented in three phases.              Support the implementation of GOK policy and institutional reform in view of improving countrywide road network management, road safety and intermodality.


Project Title: Arusha-Holili/Taveta-Voi Road Project


Project ID: 2013/054624


Implementing Agency:  State Department of Infrastructure


Total Funding by African Development Bank/ Fund: **UNDECLARED AMOUNT**


Duration: 60 months


Project Description:


The project is to develop the road corridor between Arusha in Tanzania and Voi and to Mombasa port in Kenya. Project will contribute to the reduction of poverty and promote regional integration.


Project Title: Nairobi Outer Ring Road Improvement Project


Project ID: 2013/054673


Implementing Agency:  State Department of Infrastructure


Total Funding by African Development Bank/ Fund: 2,129,045,945 KES


Duration: 57 months


Project Description:


The project has five components namely:


- Road construction Civil works which involves improvement of the existing 13 km single carriageway road to a 2- lane dual carriageway complete with service roads, pedestrian foot-over-bridges, walkways and complementary works such as planting of 4,500 tree, market stalls and wellness centres for HIV/AIDs and related illnesses.


- Consultancy services for design reviewing and supervision of civil works; development of urban roads maintenance strategy and technical auditing services


- The Traffic management technical assistance (TA) in order to improve the efficiency of the entire transport system.


- Training of at least 500 youths currently working in the informal sector within the transport corridor and have no formal training. The Youths will be trained as artisans to enable them secure gainful employment thereafter.


- Compensation and resettlement of the affected persons identified in the project Environmental and social impact Assessment.


The objective of this project is to improve the existing Outer ring Road in the City of Nairobi into a dual carriageway in order to expand its traffic carrying capacity to ease traffic congestion and in turn enhance economic efficiency through improved mobility and accessibility to business.


Project Title: Dualing of Nairobi- Dagoretti Corner Road Phase 1


Project ID: 2014/054756


Implementing Agency:  State Department of Infrastructure                       


Total Funding by Government of Japan: 5,818,068,404 KES


Duration: 11 months


Project Description:


Road decongestion


Project Title: Road Maintenance & Safety


Project ID: 2014/054715


Implementing Agency:  Ministry of Transport and Infrastructure                              


Total Funding by Government of Kenya: **UNDECLARED AMOUNT**


Duration: 36 months


Project Description:


To promote roads that are well maintained thus enhancing road safety to ensure all roads are well maintained both nationally and regionally thus enhancing safety .


Project Title: Development of Mombasa to Nairobi Standard Gauge Railway


Project ID: 2014/055202


Implementing Agency:  State Department of Infrastructure       


Total Funding by Government of China: **UNDECLARED AMOUNT**


Duration: 17 months


Project Description:


Development of Mombasa to Nairobi Standard Gauge Railway


Project Title: Drilling and capping of Muuani borehole


Project ID: 2014/055202


Implementing Agency:  State Department of Transport


Total Funding by Government of Kenya: **UNDECLARED AMOUNT**


Duration: 17 months


Project Description:


Drilling, capping and pipeline distribution of Muuani borehole to ensure water distribution and accessibility.


Project Title: DFID Grant for One Stop Border Posts       


Project ID: 2014/055405


Implementing Agency:  State Department of Infrastructure


Total Funding by United Kingdom DFID (UK): **UNDECLARED AMOUNT**


Duration: 85 months


Project Description:


Taveta and Busia One Stop Border Post Project under the East African Trade Facilitation Programme to ease trade activities in the region.


Project Title: Upgrading Rumuruti - Maralal Road (C77)


Project ID: 2014/054891


Implementing Agency:  MOR Kenya National Highway Authority              


Total Funding by Government of France: 4,000,000,000 KES


Duration: 35 months


Project Description:


It involves upgrading 35km of road networks to ease traffic and facilitate trade and commerce nationwide.        


Project Title: Jomo Kenyatta Airport Interim Terminal Construction Project (Thika Road Project/Education III Project)  


Project ID: 2014/054982


Implementing Agency:  State Department of Infrastructure       


Total Funding by African Development Bank/ Fund: 2,000,000 KES


Duration: 19 months


Project Description:


The project entails the utilization of the loan savings from the Nairobi-Thika Highway Improvement project and Education III project to assist GoK to restore the levels of services at JKIA, which have deteriorated following the fire accident that occurred at the airport in August 2013. To contribute to a return to normalcy of services at JKIA by construction of an interim terminal.